29th June, 2021
Edwards Architecture were commissioned to design and deliver a new 10 Mega Watt Energy from waste facility in Chilton. The scheme was extremely innovative being the first of its kind in the north East. Working closely with Dalkia Energies engineers we ensured that we were able to co-ordinate our Architectural elements such as the main housing of the boilers with the technology and structural engineering information.